AWARDED
SOUTHEAST
  • Project: New Community Center/Recreation Center, at City Beach, Oconomowoc, Waukesha County
  • Overall cost estimate: $4,000,000
  • Phase: CONSTRUCTION BIDS, BID PACKAGES 1 THROUGH 9, (Package 1: Structural [earthwork, asphalt paving, structural and site concrete, structural steel and wood framing]; Package 2: Enclosure [masonry, roofing, siding, glass & glazing, cold formed framing and gypsum wall board]; Package 3: Interiors [acoustical ceilings, flooring, painting, general trades]; Package 4: Elevator; Package 5: Fire Protection; Package 6: Plumbing; Package 7: HVAC; Package 8: Electrical; Package 9: Landscape and Modular Retaining Walls)
  • Bids closed: Feb. 16, 2012 at 2:00 PM, (no faxed or electronically submitted bids will be accepted). Bidders may bid on as many or as few bid packages as they wish, but only one bid may be in a single envelope and each separate bid must have bid security. Bids will be reviewed and qualified privately by the construction manager and the city after the public bid opening
  • Owner: Oconomowoc, City of, Clerk's Office - City Hall, 174 E. Wisconsin Ave., Oconomowoc, WI 53066; 262-569-2186
  • Operating Division: Oconomowoc, City of, Parks, Recreation and Forestry Department, 220 W. Wisconsin Ave., Oconomowoc, WI 53066; 262-569-2199, Fax 262-569-3221
  • Architect: Groth Design Group Inc., N58 W6181 Columbia Road, P.O. Box 332, Cedarburg, WI 53012; 262-377-8001, Fax 262-377-8003
  • Construction Manager: J.H. Findorff & Son Inc., 1600 N. Sixth St., Milwaukee, WI 53212; 414-272-8788, Fax 414-272-0443
  • Contracts Let:
  • Bid Package 1: Structure
  • Tri-North Builders Inc.,
  •     Waukesha ..................................................$1,206,816.00
  • Bid Package 2: Enclosure
  • J.H. Findorff & Son Inc.,
  •     Milwaukee ..................................................$1,211,800.00
  • Bid Package 3: Interiors
  • J.H. Findorff & Son Inc.,
  •     Milwaukee ..................................................$484,000.00
  • Bid Package 4: Elevator
  • Schindler Elevator Corp.,
  •     Menomonee Falls ..................................................$52,500.00
  • Bid Package 5: Fire Protection
  • Monona Plumbing & Fire Protection,
  •     Madison ..................................................$83,000.00
  • Bid Package 6: Plumbing
  • Total Mechanical Inc.,
  •     Pewaukee ..................................................$140,283.00
  • Bid Package 7: HVAC
  • Sure-Fire Inc.,
  •     Horicon ..................................................$469,000.00
  • Bid Package 8: Electrical
  • Midwest Electric LLC,
  •     Johnson Creek ..................................................$323,800.00
  • Bid Package 9: Landscaping
  • Trees On The Move Inc.,
  •     New Berlin ..................................................$56,686.00
  • (See "Bids Received" section for further information)